Preventive Maintenance Checklist - Toshiba e-STUDIO203 Service Handbook

Hide thumbs Also See for e-STUDIO203:
Table of Contents

Advertisement

4.3

Preventive Maintenance Checklist

Symbols used in the checklist
Cleaning
A: Clean with alcohol
B: Clean with soft pad,
cloth or vacuum
cleaner
[Preventive Maintenance checklist]
Notes:
1. Perform cleaning and lubricating in the following timing.
Exceptionally, the lubrication for the drum unit, main charger, developer unit and transfer unit
must follow the PM cycle of each unit.
e-STUDIO163: every 72,000 sheets
e-STUDIO203: every 90,000 sheets
2. Value under "Replacement" indicates the replacement cycle for e-STUDIO163/
e-STUDIO203.
3. The replacement cycle of the parts in the feeding section equals to the number of sheets fed
from each paper source.
4. Be careful not to put oil on the rollers, belts and belt pulleys when lubricating.
5. Page-Item (P-I) is described in the column of the Parts list.
A. Scanner
Items to check
A1
Original glass
A2
ADF original glass
A3
Carriage rail
A4
Original glass guide
B. Laser unit
Items to check
B1
Slit glass
December 2005 © TOSHIBA TEC
Lubrication/Coating
L:
Launa 40
SI:
Silicon oil
W1:
White grease
(Molykote X5-6020)
W2:
White grease
(Molykote HP-300)
AV:
Alvania No.2
FL:
Floil (GE-334C)
Cleaning
Lubrication
(x 1,000 sheets)
B or A
B
B
B
Cleaning
Lubrication
(x 1,000 sheets)
B
4 - 3
06/04
Replacement
Value:
O: After cleaning or
Replacement
cycle
(Value x 1000)
R:Replace if
deformed or
damaged
Replacement
Operation
check
R
Replacement
Operation
check
e-STUDIO163/203 PREVENTIVE MAINTENANCE (PM)
Operation check
replacement, confirm
there is no problem.
Parts list
Remarks
<P-I>
P17-I1
*a1
P17-I2
*a1
P9-I9
Parts list
Remarks
<P-I>
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio163

Table of Contents