Carriage 1 - Toshiba 8070 Service Manual

Digital plain paper copier
Table of Contents

Advertisement

4.
COPIER OPERATION
4.1 Operation Outline
Copier operation
4.2 Description of Operation
4.2.1
Warming up
(1) Initialize operation
• The main switch is turned ON.
• The heater lamp is turned ON.
• Copy quantity indicator "1" and "WAIT WARMING UP" are displayed.
• Fan
• Initialization of the scanning optical system
~ The carriages move to their home positions and then stop.
~ The carriages move to the peak detection position.
~ The halogen lamp is turned ON. ~ The peak is detected. (white color detection of the shading
correction board) ~ The halogen lamp is turned OFF.
~ Original size indicators are initialized and move to a position indicating the copy area.
• Initialization of the paper feed section
~ Each slot's cassette trays move upward.
~ The ADU (auto-duplexing unit) guides move to the maximum size position after their home
position is detected.
• Initialization of laser optical system
~ The polygon mirror is rotated.
~ The beam position is controlled.
• Other
~ The main charger cleaner operates.
(2) Pre-running operation
When the heater reaches a preset temperature, the pre-run operation is carried out. (This operation
is not carried out if the heat roller is sufficiently hot.)
• The fuser unit rotates.
• The drum rotates.
~ The drum motor, fur brush motor and auger motor turns ON.
• Maintenance of image control
~ A patch is formed on the drum, and the reflectivity of this patch is read so that the optimum
conditions are set.
• This operation stops after 2 minutes of operation.
Mar. 1999 © TOSHIBA TEC
Operation during warm up and standby
Copying operation
4 - 1
Automatic feed copying using PRINT key
Bypass-feed copying
Interrupt copying
6570/5570 COPIER OPERATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

657055704580

Table of Contents