Site Selection - Rheem RGFE Installation Instructions Manual

Dedicated horizontal high efficiency modulating condensing gas furnace
Table of Contents

Advertisement

FIGURE 8
BASE FOR COMBUSTIBLE FLOORS

SITE SELECTION

1. Select a site in the building near
the center of the proposed, or exist-
ing, duct system.
2. Give consideration to the vent sys-
tem piping when selecting the fur-
nace location. Vent from the fur-
nace to the termination with mini-
mal length and elbows.
3. Locate the furnace near the exist-
ing gas piping. If running a new gas
line, locate the furnace to minimize
the length and elbows in the gas
piping.
4. Locate the furnace to maintain
proper clearance to combustibles
as shown in Figures 9, 10 & 11.
WARNING
COMBUSTIBLE MATERIAL MUST
NOT BE PLACED ON OR AGAINST
THE FURNACE JACKET. THE AREA
AROUND THE FURNACE MUST BE
KEPT CLEAR AND FREE OF ALL
COMBUSTIBLE MATERIALS
INCLUDING GASOLINE AND OTHER
FLAMMABLE VAPORS AND LIQ-
UIDS. PLACEMENT OF COM-
BUSTIBLE MATERIALS ON,
AGAINST OR AROUND THE FUR-
NACE JACKET CAN CAUSE AN
EXPLOSION OR FIRE RESULTING IN
PROPERTY DAMAGE, PERSONAL
INJURY OR DEATH. THE HOMEOWN-
ER SHOULD BE CAUTIONED THAT
THE FURNACE AREA MUST NOT BE
USED AS A BROOM CLOSET OR
FOR ANY OTHER STORAGE PUR-
POSES.
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

RgjfRgge

Table of Contents