Precautions During Brazing Of Lines - Heat Controller RSGxxS-1D Series Installation, Operation & Maintenance Manual

Rsgxxs-1d series, rsgxxr-1d series, hrgxxs-1d series split system a/c & heat pump-1.5 to 5 ton
Table of Contents

Advertisement

Correct
TO
POWER
SUPPLY
TO
INDOOR
BLOWER
TO
COIL
Seal opening(s) with
permagum or equivalent
NOTE:All outdoor wiring must be weather proof
Fig.5 Typical Installation

3.6 PRECAUTIONS DURING BRAZING OF LINES

All outdoor unit and evaporator coil connections are copper-to-copper and should be
brazed with a phosphorous-copper alloy material such as Silfos-5 or equivalent. DO
NOT use soft solder. The outdoor units have reusable service valves on both the liquid
and suction vapor connection. The total system refrigerant charge is retained within the
outdoor unit during shipping and installation. The reusable service valves are provided
to evacuate and charge per this instruction.
Serious service problems can be avoided by taking adequate precautions to assure an
internally clean and dry system.
Sheet Metal Hanger
Insulated Vapor Line
Incorrect
Insulated Liquid Line
Fig.3 Tubing Hanger
Fig.4 Underground Installation
WEATHERPROOF
DISCONNECT
SWITCH
11
Tape

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents