Inspection and First-Time Setup Procedure

Unit Inspection
1.
In your shop, unpack and carry out a visual inspection of the unit for any shipping damage.
NOTE
All preparation work should be done in a clean area. A separate room is recommended.
2.
A Culligan IQR form is shipped with each unit. Fill out the IQR form and return to Culligan Quality
Department.
3.
Remove the top cover of the machine. This is retained by two screws located under the front edge at the
bottom of the cover and two clips in the same location. Remove the screws and push clips up to release. To
gain easier access to the screws, tilt the machine backward at an angle of 10 degrees.
10°
4.
Visually inspect the internals of the machine for any wires or pipes that may have come loose in shipping.
Prepare the Unit for Sanitizing
1.
Plug the filter heads based on the configuration of the unit.
Aqua-Cleer
Filter
Use bypass plugs (P1020279).
®
Aqua-Cleer
RO
Use bypass plugs (P1020279).
®
LC 100 RO
Use bypass plugs (01010098). Plug the
restrictor outlet in the RO head with a
3/8" stem plug (01005650).
AC 50 RO
Attach empty housings to manifold.
2.
Using the sanitizer cartridge, remove the bottom screw plug of the sanitizer cartridge and pour in 15 mL of
unscented, liquid chlorine bleach (6% Sodium Hypochlorite)
3.
Carefully screw the bottom plug into the cartridge and insert cartridge into the left hand single head inside
cooler
4.
Connect a clean, filtered, soft water supply to the unit. Pressure must be 40–60psi (2.8–4.1 bar).
5.
Ensure the red switch on the rear of the unit is in the OFF position. Connect the power cord to the unit and
to a power supply. 15A with GFI is recommended.
Culligan® All Purpose Cooler
6
Figure 2. All Purpose Cooler unit balancing screws.
6
Cat. No. 01023621