Cc Basic™ Inspection And Setup - Culligan Aqua-Cleer CC Basic Filter Installation & Operation Manual

Bottle-less
Table of Contents

Advertisement

CC Basic™ Inspection and Setup
Inspect the Unit
NOTE
All preparation work should be done in a clean area. A separate room is recommended.
1.
Inspect the carton for evidence of shipping or handling damage.
2.
Unpack the unit and inspect the plastic parts.
Install Point of Use Assembly Kit—Part Number 01017703
1.
On the CC Basic™ unit, remove the locking pin from the Crystal Guard.
NOTE
May require the use of a tool to remove pin.
2.
Press on the Guard rim and turn counter clockwise to remove (Figure 1).
3.
Open the POU Kit box and check the assembly for damage.
4.
Verify the float mounting pins are firmly inserted onto the float arm.
5.
Ensure that both floats are positioned downwards.
6.
Install the POU kit on the CC Basic™ unit (Figure 2).
4
Culligan® Aqua-Cleer® CC Basic™
Crystal Guard
Open
Figure 1.
Locking Pin
4
Cat. No. 01021819

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents