Direct Venting (Two Pipe System); Side Wall Vent Termination [Stainless Steel, Cpvc Or Pp] - Viessmann Vitocrossal 200 CM2 Series Installation Instructions Manual

Gas condensing boiler with cylinder burner heating input: 663 to 1112 mbh 194 to 326 kw
Hide thumbs Also See for Vitocrossal 200 CM2 Series:
Table of Contents

Advertisement

Vitocrossal 200 CM2 Installation Instructions

Direct Venting (Two Pipe System)

Side wall vent termination [stainless steel, CPVC or PP]

Stainless steel or
plastic mesh
Min. 26 in.
(660 mm)
o
Intake terminal 90
Min. 2 in. (50 mm)
Max. 36 in. (915 mm)
Support bracket
Side wall
* Field fabricated vent riser
Min. 12 in.
(305 mm)
Exhaust vent
o
terminal 45
Grade or max.
snow level
Vent
Min. 12 in.
(305 mm)
Air
Min. 2 in. (50 mm)
Termination elbow
with screen
Max. 36 in.
Vent
(915 mm)
*
Min. 12 in.
(305 mm)
Caulk
Grade or max.
snow level
IMPORTANT
The exhaust vent/air intake system must terminate so
that proper clearances are maintained as cited in local
codes or the latest edition of the "Natural Gas and
Propane Installation Code" CAN/CSA-B149.1 (Canada),
or the "National Fuel Gas Code" ANSI Z223.1 (NFPA
54) (U.S.A.).
IMPORTANT
For PP systems, all exhaust vent and air intake piping
and elbows exposed outside, must be UV resistant
polypropylene (supplied by the vent manufacturer).
WARNING
Vent termination must be at least 12 in. (305 mm)
above the anticipated snow level (consult your local
building authorities or local weather office). Locate
vent termination in such a way that it cannot be
blocked by snow.
Venting
35

Advertisement

Table of Contents
loading

Table of Contents