1. Insert drain tubes into drain trap and position the drain
trap against the side panel. NOTE: Drain tubes must
reach the bottom of the drain trap.
2. Secure drain trap to side panel at the mounting holes
(dimples or crosshairs on counterflow models) located
below the grommet drain holes.
3. Attach PVC drain line to drain trap outlet with either a
90° elbow or coupling.
H
I
ORIZONTAL
NSTALLATIONS
Horizontal installations with the right side down require that the
drain hoses be connected to the right side front cover drain port
and the rubber elbow drain port.
NOTE: On counterflow models, relocation of the front cover
pressure switch hose is required.
Make connections as follows:
1. Remove the rubber plug/cap from right side of the front
cover drain port.
Counterflow furnaces
Relocate the front cover pressure switch hose connection
from the left side pressure tap to the right (down) side
For details concerning mounting of the drain trap, refer to Condensate Drain Lines and Drain Trap - Horizontal Drain Trap
Mounting.
HOSE A
HOSE B
DRAIN TRAP
(L
R
S
EFT OR
IGHT
IDE
- R
S
D
IGHT
IDE
OWN
FRONT COVER
DRAIN PORT
RED HOSE
CLAMP
TUBES 2
Horizontal Connections - Right Side Down
(Upflow Shown, Counterflow Similar)
P
)
tap. The pressure switch hose must be connected to
ANEL
the down side to guard against blocked drain conditions.
Cut hose to appropriate length to minimize sagging. Plug
left (unused) pressure tap with plug removed from right
side.
2. Secure Hose A to front cover drain tap with a red hose
clamp. Route hose to rear right (down) side panel
grommet holes.
3. Cut 1/4 inch from the end of the drain port on the rubber
elbow and discard.
4. Insert Tube 1 into rubber elbow drain port and secure
with a silver hose clamp. Angle tube outward toward front
of furnace.
5. Cut 17 3/4 inches from the long end of Hose B and
discard.
6. Secure remaining end of Hose B to exposed end of
Tube 1 with a green hose clamp. Route hose to front
right down side panel grommet holes.
7. Cut 5 1/2 inches straight length from the long end of
each Tube 2 and discard the radius pieces.
8. Insert approximately one inch of each Tube 2 through
the right down side panel grommet holes. Secure tubes
to Hose A and Hose B using green hose clamps. Ensure
hoses and tubes maintain a downward slope for proper
drainage and are not kinked or bound.
PRESSURE
GREEN
HOSE
TUBE 1
CLAMP
(3 PLACES)
24
FRONT
COVER
RUBBER
TAP
ELBOW
RIGHT
SIDE
PANEL
RUBBER ELBOW
DRAIN PORT
SILVER HOSE
CLAMP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents