Cabinet And Duct Dimensions - York G8C05012(MU,MD)B12 Technical Manual

G8c series 80 afue multi-position gas furnaces
Table of Contents

Advertisement

270844-YTG-A-0407

CABINET AND DUCT DIMENSIONS

BTUH (kW)
Input
1
G8C05012(MU,MD)B12
1
G8C07512(MU,MD)B12
1
G8C07516(MU,MD)C12
1
G8C10016(MU,MD)C12
1
G8C10020(MU,MD)D11
1
G8C12520(MU,MD)D11
3
G8C15020UHD11
1. 4-position models may be factory configured as upflow (MU) or downflow (MD).
2. 3-position 150 MBH model available only in upflow/horizontal (UH) configuration.
4. Dimensions "B", "C", "D", and "E" are with duct flanges turned up. "F", "G", "H", & "J" are with flanges flat.
3. All models are supplied with 3" (7.62 cm) vent connections. An installer supplied transition to 4" (10.16 cm) or 5" (12.7 cm) must be used where necessary.
2
B
C
31-1/2
29-3/4
A
F
G
Nominal
Cabinet
CFM
Size
A(in.)
1200
B
17 1/2 16 1/2
1200
B
17 1/2 16 1/2
1600
C
21
1600
C
21
2000
D
24.5
2000
D
24.5
2000
D
24 1/2 23 1/2
K
31-1/2
A
Cabinet Dimension
B(in.)
C(in.)
D(in.)
E(in.)
20 3/8
20.0
16
20 3/8
20.0
16
20
20 3/8
20.0
19 1/2 18 1/4 18 3/4 18 5/8
20
20 3/8
20.0
19 1/2 18 1/4 18 3/4 18 5/8
23 1/2
20 3/8
20.0
23
23 1/2
20 3/8
20.0
23
20 3/8
20.0
23
E
D
K
16-1/4
14
29-3/4
H
J
F(in.)
G(in.) H(in.)
J(in.) K Vent (in.)
14 3/4 18 3/4 15 1/8
19.0
14 3/4 18 3/4 15 1/8
19.0
19.0
19.0
21 3/4 18 3/4 22 1/8
19.0
21 3/4 18 3/4 22 1/8
19.0
21 3/4 18 3/4 22 1/8
19.0
Unitary Products Group
3
2
4
2
4
2
4
2
4
2
5
2
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents