1-B

Adjust the developing bias voltage

This adjustment is needed in the following situations:
* The high voltage power PWB (MC/DV/TC) has been replaced.
* U2 trouble has occurred.
* The PCU PWB has been replaced.
* The EEPROM of the PCU PWB has been replaced.
(Main charger grid voltage adjustment)
Item/operation mode
Copy
Auto mode
Text mode
Text/photo mode
Photo mode
Printer
All modes
FAX
All modes
Cleaning mode
1)
Remove the rear cover of the machine.
2)
Apply a digital multi-meter to the connector CN2 pin (7) of the
high voltage PWB and the chassis GND.
CN2
3
3)
Go through the modes specified in Simulation 8-1.
SIMULATION 8-1
DV BIAS SETTING. SELECT 1-7, AND PRESS START.
1.AUTO
495
2.CHARACTER
3.MIX
495
4.PHOTO
5.PRINTER
495
6.FAX
Press [START] key.
1-C

Adjust the transfer current, voltage

(Transfer voltage adjustment)
Item/
operation
mode
Front print
8-6
FRONT
Back print
BACK
Transfer belt
8-17
SHV FRONT
(cleaning)
SHV BACK
THV-
Transfer
8-18
CRHV PLUS
roller
(cleaning)
Transfer
CRHV MINUS
roller (print)
* MX-M700 only
8-1
AUTO
CHARACTER
MIX
PHOTO
PRINTER
FAX
PLUS
495
495
495
7.PLUS
150
Press [SYSTEM SETTINGS] key.
Simulation
Setting
Default
range
0 – 800
350
400 *
0 – 800
350
400 *
0 – 600
450
0 – 600
450
0 – 75
10
0 – 250
200
0 – 250
200
MX-M700N ADJUSTMENTS 6 – 3
Simulation
Setting range
0 – 750
0 – 750
0 – 750
0 – 750
0 – 750
0 – 750
0 – 250
SIMULATION 8-1
DV BIAS SETTING. INPUT VALUE, AND PRESS START.
1:AUTO (0-750)
Press [START] key.
SIMULATION 8-1
DV BIAS SETTING. EXECUTING···.
1:AUTO
4)
Select the number that corresponds to the adjustment item
using the numeric keypad.
5)
Press the Start key.
6)
Press the start key to have the voltage output for 30 seconds.
The operation can be stopped with the SYSTEM SETTINGS
key.
If the output voltage is not within the requirement, do the fol-
1
lowing steps.
7)
Enter the adjustment value using the numeric keypad.
8)
Press the Start key. (The adjustment value is put into memory,
and the corresponding voltage is output for 30 seconds.)
Repeat steps 7 to 8 until the output requirement is satisfied.
Adjustment
voltage
Connector
(monitor voltage)
DC – 100 10v
CN2
+2.0 10.1v
–2.0 10.1v
High voltage power PWB (MC/DV/TC)
Default
Connector
495
CN2
495
CN2
495
CN2
495
CN2
495
CN2
495
CN2
150
CN2
Press [SYSTEM SETTINGS] key.
Or after 30sec output.
Actual voltage
Pin #
/actual current
35 1.0 A (1.0 – 1.5Kv)
40 1.0 A (2.0 – 2.5Kv) *
35 1.0 A (1.0 – 1.5Kv)
40 1.0 A (2.0 – 2.5Kv) *
AC4.5Kv (p-p)
AC4.5Kv (p-p)
1
DC –100 10v/AC4.5Kv (p-p)
Check
+2000 100v
pin
Check
–2000 100v
pin
Pin #
Actual voltage
7
–500 5v
7
–500 5v
7
–500 5v
7
–500 5v
7
–500 5v
7
–500 5v
7
+500 5v
495
495
High voltage
power PWB
(MC/DV/TC)
High voltage