Department Of Energy Compliance - Weil-McLain CGi Series 3 Installation And Maintenance Manual

Gas-fired
Hide thumbs Also See for CGi Series 3:
Table of Contents

Advertisement

CG i
GAS-FIRED wATER BOILER- sERIEs a -
Boiler Manual
9
Department of Energy - Compliance
This
boiler
is equipped with
a
control
system
that
a
utomatically adjusts
a time delay period
to
turn
on
the boiler
during a
call
for heat. This is accomplished by
circulating available
hot water in the system
while
measuring
water boiler water temperature
changes.
The
control
calculates a suitable delay based on temperature
measure-
ments and turns the boiler on only after it determines that the demand for heat cannot be satisfied with the
available hot
water.
Due to the wide variety of controls used in boiler
installations,
this
control
is also equipped with an adjustment
for the calculated time delay period (ECONOMY ADJUST). In the
MIN position,
the time delay is zero and the
IMPORThNT notice below must be observed:
IMPORTANT
In
accordance with Section 325 (f)
(3)
of the Energy Policy and Conservation Act, this boiler
is
equipped with
a feature
that
saves energy
by
reducing the boiler water
temperature as
the heating
load
decreases. Th
is
feature
is
equipped with
an
override
wh ich
is provided primarily
to
permit
the use
of
an
e.nernal energy management
system
that
serves
the
same
function.
T HIS OVERRIDE
MUST NOT
BE USED UNLESS AT LEAST ONE O
F
THE FOLLOWING CONDITIONS IS TRUE:
An external energy
management
system is installed
that
reduces
the boiler water temperature
as
the heating
load
decreases.
Tilis boiler is part
of
a modular or
multiple
boiler
system
having a
total input
of
300,000
BTU/hr or
greater.
This
boiler is
equipped
with a tankless coil.
9a
Operation - sequence
I
.
Read
Operating instructions
on page
41.
This
infom1ation
is also
located on
a
label
on
the inside
of
the
boiler jacket
door
panel.
b.
If
pilot
does
light and control
module senses flame
current,
spark generator is
turned
off
and main
valve
opens.
2.
Raise
room
them10stat to call
for heat.
a.
While attempting to
satisfy
the heat demand,
the
control
module monitors
the
boiler
temperature
changes via
the
tem-
perature
sensor
and determines whether
or
not
the available
hot water
will
satisfy the
demand,
only running
the circulator.
If additional heat is needed,
the
sequence continues.
When
DH
W
(if
used) calls for
heat,
sequence
above is
bypassed.
3.
Circulator energizes.
Iflimit circuit
is
closed, the inducer
starts. After
pressure
switch proves proper
airflow,
control
module initiates
I
0-second
prep urge.
4.
Control
module
sparks
the pilot and
opens pilot valve
in
main
gas
valve.
a.
If
pilot
does
not
light
within
IS
seconds, pilot
valve
is
closed and
spark generator is
turned
off. Control
module
initiates
a IS-second
postpurge, then starts a
new cycle.
Part Number 550-142-780/0712
s.
The CGi-4 timer relay delays
high
fire for the first
60
seconds
of
main
flame.
6.
During main burner
operation:
a
Control
module
monitors
pilot
flame current.
If signal
is
lost,
main
valve
doses, spark
generator
activates and
sequence returns
to
step
4
.
b.
If power is
intenupted,
control system
shuts
off
pilot
and main
gas valves
and restarts at
step
1
when
power
is
restored.
7.
In
the
event the
limit control
shuts
down the boiler
-
The
control module
doses
the pilot and main
gas valves, but
keeps
the inducer
operating for
IS-second
postpurge.
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgi-25Cgi-5Cgi-4Cgi-6Cgi-8Cgi-7

Table of Contents