Check-Out Procedure - Checklist - Weil-McLain CGi Series 3 Installation And Maintenance Manual

Gas-fired
Hide thumbs Also See for CGi Series 3:
Table of Contents

Advertisement

CG i
GAS-FIRED wATER BOILER- sERIEs a -
Boiler Manual
8
Check-out procedure - checklist
0
Boiler and heat distribution units filled with
water?
0
Automatic
air vent, if
used,
o
pen
one
full
turn?
0
Air purged from system
?
0
Air purged from
gllS
piping?
Piping checked for
leaks?
0
Correctly
sized
manifold
o
rifices
installed?
Refer
to
Table
2,
page 12, to check
size
and fuel type.
0
0
0
0
Set
Economy
mode,
fully clockwise.
For
multiple
zones, adjust flow
so
it is
about
the same
in
each rone.
Verify thermostat
heat
anticipator (if
available)
set
properly?
Refer
to
Field wiring,
manual
Sectio
n
6, page 31,
Thennostatjs).
ftj.t!)Uijj;l
Correctly
sized
manifold
o
rifices must
be
used
.
Failure to do so will cause severe
personal injury,
Cycle
boiler with
thermostat
-
Raise to
highest
setting
and
verify boiler goes through
normal
start-up cycle. Lower to
lowest
setting
and
verify boiler goes off.
death or
substantial
pro perty
dam
age.
0
Followed
o perating instructions
on boiler
or in manual
Section
9
fo
r proper
start-up?
0
Proper burner
flante observed?
Refer
to
Check bumerflame,
manual Section
7b.
0
Test
temperature lim it
-
While burners are o
peratin.J, turn
Boiler Tlmtg:djustment knob
cmmterclockwise
wttil
isplay
reading
is
low
actual boiler water
temperature.
Burners
should.Jo off while
circulator
continues to
erate.
Tum
Boiler
mp adjustment knob
clockwise
tmtil
isplay
read-
ing is above
boiler water
temperature
and
ignition sequence
sho uld resume.
0
Test additional field-installed
controls- If
boiler has a
low
water
cutoff, additional high
limit
o
r other
controls, test for
operation as outlined
by manufacturer.
Burners
should
be
operating and sho uld to off
when
controls are testecl
When
controls are restored, urners should reignite.
0
Test
ignitio
n system
safety device:
a. Connect manometer to outlet side of gas valve.
b.
Start boiler,
allowing
for normal start-up
cycle to
oc-
cur
and main burners to ignite.
c.
With
main
burners o
n,
manually shut off gas supply at
manual
main
shutoff gas
valve.
Burners
should
go
off.
d.
Open
manual
main
shutoff
gllS
valve. Manometer
should
confirm
there
is no gas
flow.
e.
Pilot
will relight,
flame sensing
element
will
sense
pilot
flame
and main burners will
reignite.
0
0
0
0
0
0
0
Cycle DHW
Aquastat if
usecl
Measure
natural
gas input:
a. Operate
boiler 10
m inutes.
b.
Tum
off other appliances.
c.
At natural
gllS
meter, measure time
(in
seconds)
re-
quired
to use o ne cubic
foot
of gas.
d. Calculate gas input:
3600
X
1000
=
Btuh
number
of
seco
nds
fro
m s tep c
e.
Btuh calculated should
approximate
input rating on
boiler
rating label.
Check manifold gas pressure by connecting
manometer
to
downstream test
tapping o
n main
gllS
valve.
Manifold
pres-
sure
for natural
gas
should
be
3.5"
w.c. and fo
r
propane gas
sho uld be tO
"
w.c.
Observe several operating cycles fo
r proper
operation.
Set
room thermostat
to
desired room
temperature.
Fill
in Installation and
service certificate
below?
Review
all
instructions shipped
with
this
boiler with
owner
or maintenance person.
Return
instructions to envelope
and
give to
owner or
place
in pocket
inside
front panel in
boiler.
0
Set lintit
control(s) to
system
temperature requirements.
36
Adjust balancing valves
and
controls to provide
design
temperature to system.
Installation
and service certificate
Boiler
model
_ _ _ _ _ _ _ _
Series
_ _ _ _
CP munber
_ _ _ _ _
Date
installed
_ _ _ _ _
Measured Btuh
input- - - - - - - -
0
Installatio
n
instructions have
been
followed.
0
Check
out
sequence has been performed.
0
Above
information is certified
to be correct.
Installer
- - - - - , , - - - . , - - - -
(company)
0
Information received
and left with
owner/maintenance person
{address)
(pho ne)
Installer's
signature:
- - - - - - - - - - - - - - - -
Part Number 550-142-780/0712

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgi-25Cgi-5Cgi-4Cgi-6Cgi-8Cgi-7

Table of Contents