Page 2
This warranty is conditioned on the Buyer 1) giving BUNN prompt notice of any claim to be made under this warranty by telephone at (217) 529-6601 or by writing to Post Offi ce Box 3227, Springfi eld, Illinois 62708-3227; 2) if requested by BUNN, shipping the defective equipment prepaid to an authorized BUNN service location;...
RELEASED FOR PRODUCTION CONTENTS Site Requirements....................4 Installation......................5 Operating Controls....................6 Operation......................7 Cleaning.......................8 Menu Options......................9 Troubleshooting....................11 USER NOTICES Carefully read and follow all notices in this manual and on the equipment. All labels on the equipment should be kept in good condition. Replace any unreadable or damaged labels. To reduce the risk of electric shock, do not remove or open cover.
Bunn-O-Matic does not recommend the use of a sad- dle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water fl...
RELEASED FOR PRODUCTION SITE REQUIREMENTS Site Requirements 1. Counter able to support at least 150 pounds (68kg). 2. Counter area large enough for machine and refrigerator. 3. Minimum clearance of 2˝ around machine. Electrical-SureTamp 1. 208VAC, 2 wires with ground. 2.
RELEASED FOR PRODUCTION INSTALLATION-SURETAMP Drain Install 1. Install drip tray bracket with 3 screws (included in bag). 1. Attach the short drain hose to the drip tray fi tting. 2. Slide drip tray onto guide rails on front of machine. 3.
Page 7
RELEASED FOR PRODUCTION INSTALLATION-REFRIGERATOR Milk Module Installation-counter top 1. Align hoses and harnesses through holes in back of refrigerator and slide module into cabinet on the pre-installed brackets. Milk Module Installation-under counter 1. Align hoses and harnesses through hole on top of refrigerator and slide module into cabinet on the pre-installed brackets.
RELEASED FOR PRODUCTION OPERATION Left bean hopper Right bean hopper Small Whole milk Medium Low fat milk Large Hot milk Syrup Cold milk DRINK TYPES 1. Americano (hot water added to espresso). 2. Cappuccino (traditionally prepared with espresso, hot milk, and steamed-milk foam). 3.
RELEASED FOR PRODUCTION RINSING/CLEANING RINSING Press the "care & cleaning" tab to access. Place container under dispense heads. Coffee rinse: – Press "coffee rinse". Milk rinse: – Press "milk rinse". DAILY CLEANING NOTE: You will need pitcher (supplied), brush, "Cafi za Coffee" cleaning tablets, Rinza Acid tablets and cleaning tube on hand.
RELEASED FOR PRODUCTION MENU OPTIONS Press and hold "BUNN" logo left right care & cleaning to enter "menu options" size milk type espresso x1 cappuccino milk foam top espresso x2 latte milk temp syrup syrup americano macchiato preheat READY TO BREW...
Page 12
RELEASED FOR PRODUCTION MENU OPTIONS regional settings date ( mm/dd/yyyy ) time ( hh/mm/AM ) 1. Press to highlight box. 2. Press arrows to adjust. 3. Press "save" when fi nished. language English units English Cycle through: Toggle between: press this box press this box English, Spanish, French English-Metric...
Page 13
RELEASED FOR PRODUCTION MENU OPTIONS left right cup counts cup count size milk type espresso x1 cappuccino milk americano espresso x2 milk temp 1. Press left or right (hopper). 2. Press to highlight/un-highlight box(s). latte mocha add milk DAILY select cup counts reset lifetime then press reset...
RELEASED FOR PRODUCTION TROUBLESHOOTING Notices Description “cleaning interrupted”, Redo cleaning cycle to remove this error “cleaning due now - shut down”, Machine will not dispense until cleaning is completed “check right hopper”, Right hopper is out of beans. “check left hopper”, Left hopper is out of beans.