CONNECTING RODS AND PISTONS
6. Check:
7. Install:
8. Install:
NOTE:
S Align the projection a on the big end bearings
S Be sure to reinstall each big end bearing in its
S Make sure that the characters c on both the
9. Tighten:
NOTE:
Install by carrying out the following procedures
in order to assemble in the most suitable condi-
tion.
NOTE:
S First, tighten the bolts to 15 Nm (1.5 mSkg, 11
S Retighten the bolts to 29.4 Nm (3.0 mSkg, 21
a. Replace the connecting rod bolts with new
5-88
S cylinder stud bolts 1
8 Nm (0.8 mSkg, 5.8 ftSlb)
S cylinder gasket 2
New
S big end bearings
(onto the connecting rods and connecting
rod caps)
with the notches b in the connecting rods and
connecting rod caps.
original place.
connecting rod and connecting rod cap are
aligned.
S connecting rod bolts
29.4 Nm (3.0 mSkg, 21 ftSlb)
ftSlb).
ftSlb).
ones.
ENG