U-Line Echelon 2275DWRR Installation Manual page 11

Refrigerator drawer echelon series
Hide thumbs Also See for Echelon 2275DWRR:
Table of Contents

Advertisement

Minor Adjustment:
Note: The mounting holes
on the slide are slightly
larger than the screws'
diameter.
1. Loosen one slide's
mounting screws.
2. Level the slide.
3. Retighten the screws.
See Figure 18.
4. Repeat procedure for
the other slide.
Severe Adjustment:
Note: The slides have
extra mounting holes that
may be used.
1. Loosen one slide's rear
mounting screws.
2. Remove the slide's
front mounting screws.
3. Reposition the slide so
it is level.
4. Mark new front drilling
holes using a different
set of mounting holes on the slide. See Figure 19.
5. Drill the new holes with a #30 drill bit.
6. Remount the slide.
7. Repeat procedure for the other slide.
Top-to-Bottom (and Left-to-Right)
Adjustment
Not Aligned
Top-to-Bottom
Front View of Unit
Figure 20
See Figure 20. The drawer will need a Top-to-Bottom
Adjustment if, when viewed from the front, the drawer is
not level horizontally. Viewed from the top, one side will
protrude. This is caused by one of the slides being
mounted higher than the other slide on the unit's liner.
09/2007
2275DWRR — Drawer Model Refrigerator
Screws Should
Be Loose
Level the Slide
Figure 18
Mark and Drill New
Mounting Holes
Level the Slide
Figure 19
Not Aligned Left-to-Right
Top View of Unit
Minor Adjustment:
Note: The mounting holes
on the slide are slightly
larger than the screws'
diameter.
1. Loosen one slide's
mounting screws.
2. Push the slide upward
or downward to match
the position of the
other slide.
3. Retighten the screws.
See Figure 21.
4. Repeat the procedure with the other slide if necessary.
Severe Adjustment:
Note: The slides have
extra mounting holes that
may be used.
1. Remove one slide's
mounting screws.
2. Reposition the slide so
it is the same distance
from the bottom of the
liner as the other slide.
Measure to confirm.
3. Mark new drilling holes
using different sets of
mounting holes on the slide. See Figure 22.
Note: Front location holes are shown. Corresponding rear
holes will also need to be marked.
4. Drill all the new holes with a #30 drill bit.
5. Remount the slide.
Re-installation of Drawer
Use care when handling the drawer. Drawer edges,
drawer rail and the unit's slide may be sharp.
1. Set the drawer's rails onto the slides.
2. Re-install the rails' mounting screws. See Figure 13 on
Page 10.
3. Plug in the drawer's connection wiring (top drawer
only).
4. Go on to 6 Prepare Power Supply.
11
Loosen
Mounting Screws
Push Slide
Upward or
Downward
Figure 21
Mark and Drill New
Mounting Holes
Push Slide
Upward or
Downward
Figure 22
CAUTION
www.U-LineService.com

Advertisement

Table of Contents
loading

Table of Contents