Nordyne TC Upflow/Horizontal Installation Instructions Manual page 48

Two-stage condensing furnaces with fixed and variable speed blowers
Table of Contents

Advertisement

Inline
Drain
NOTES:
1.) All drain lines must be trapped with J-Trap or field supplied loop.
2.) Drain line traps may be positioned inside or outside the cabinet.
48
Option
1
See View -A-
VIEW -A-
Header
Box
Drain
Option
3
See View -A-
Figure 37. Upfl ow Options
1 Pipe Upflow
PVC TEE
and Reducer
PVC TEE
and Reducer
Drain Line
Attached to
3/4 x 1/2
Hose Barb
2 Pipe Upflow
PVC TEE
and Reducer
PVC TEE
and Reducer
Drain Line
Attached to
3/4 x 1/2
Hose Barb
Option
2
X
See View -B-
(This drain not needed
if "X" is less than 6".)
VIEW -B-
Header
Box Drain
Inline Drain
(Tubing is routed thru
the blower deck and
side of cabinet.)
Option
4
X
See View -B-
See
View -B-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl downflow

Table of Contents