Figure 36 - Horizontal And Vertical Venting - Nordyne TC Upflow/Horizontal Installation Instructions Manual

Two-stage condensing furnaces with fixed and variable speed blowers
Table of Contents

Advertisement

HORIZONTAL VENTING
(2-Pipe Shown)
90°
Elbow
Combustion Air
Straight Neoprene Coupling
with 2 Hose Clamps* (Optional)
VERTICAL VENTING
(2-Pipe Shown)
Support System on
Vertical Rise
Straight Neoprene
Couplings with 2
Hose Clamps
Straps or Other Suitable
Supports at minimum of 5 ft. Intervals
90° Elbow
First Support Placed
as Close to Furnace
Connection as Possible
and 1/2" x 1/2" Hose Barb
Condensate
Drain Line
First Support as Close
to Furnace as Possible
PVC TEE, Reducer,
and 1/2" x 1/2" Hose Barb
Condensate
Drain Line
See Table 2 for PVC Pipe Lengths
(Field Supplied)
Figure 36. Horizontal and Vertical Venting
Upward Pitch - 1/4" per foot
Outlet Exhaust Vent
PVC TEE, Reducer,
See Table 2 for PVC Pipe Lengths (Field Supplied)
Combustion Air
90° Elbow
Seal/Caulk
Around Pipes
at Building
7"
Wall
Normal
Snow Level
Support System on
Vertical Rise
90°
Upward Pitch
Elbow
1/4" per foot
Condensate
Drain Line
90°
Elbow
12" Min.
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl downflow

Table of Contents