Weil-McLain Gold CGi 2 Series Manual page 13

Gold cgi gas-fired water boilers series 2
Hide thumbs Also See for Gold CGi 2 Series:
Table of Contents

Advertisement

CGi
GOLD
GAS-FIRED WATER BOILER — SERIES 2 —
2b
Prepare boiler — pressure test
Hydrostatic pressure test
Pressure test boiler
(except as noted below) or electrical supply.
Prepare boiler for test
1. Remove the shipping nipple (from CGi supply tap-
ping) and remove the boiler relief valve.
plug the relief valve tapping with a ¾" NPT pipe
plug.
2. Remove 1¼" nipple, reducing tee and drain valve
from circulator hardware and pressure/temperature
gauge carton. Install in boiler return connection as
shown on page 3 and
circulator on either the return or supply.
3. Remove 1¼" nipple, 1¼" x 1¼" x ½" tee and pres-
sure/temperature gauge from circulator hardware
and pressure/temperature gauge carton. Pipe to
boiler supply connection as shown on page 3 and
Figure 42
4. Connect a hose to boiler drain valve, the other end
connected to a fresh water supply. Make sure hose
can also be used to drain boiler after test.
5. Connect a nipple and shutoff valve to system supply
connection on the 1¼" tee. This valve will be used
to bleed air during the fill. (Valve and nipple are not
included with boiler.)
6. Connect a nipple and shutoff valve to system re-
turn connection (at circulator flange if circulator
installed on return). This valve will be used to bleed
air during the fill. (Valve and nipple are not included
with boiler.)
Fill and pressure test
1. Open the shutoff valves you installed on supply and
return connections.
2. Slowly open boiler drain valve and fresh water sup-
ply to fill boiler with water.
3. When water flows from shutoff valves, close boiler
drain valve.
4. Close shutoff valves.
Part Number 550-110-710/1211
before
attaching water or gas piping
Figure 42
, page 63. Install
, page 63. (Use pipe dope sparingly.)
Boiler Manual
5. Slowly reopen boiler drain valve until test pressure
on the pressure/temperature gauge reaches no more
than:
45 psig
75 psig
Test for no more than 10 minutes at:
6.
Temporarily
45 psig
75 psig
7. Make sure constant gauge pressure has been main-
tained throughout test. Check for leaks. Repair if
found.
Drain and remove fittings
1. Disconnect fill water hose from water source.
2. Drain boiler at drain valve or out hose, whichever
provides best access to drain. Remove hose after
draining if used to drain boiler.
3. Remove nipples and valves unless they will remain
for use in the system piping.
4. Remove plug from relief valve tapping. See page 20
to replace relief valve.
for boilers with
30 psig relief valve
50 psig relief valve
for boilers with
30 psig relief valve
for boilers with
50 psig relief valve
for boilers with
Do not leave boiler unattended.
A cold water fill could expand and
cause excessive pressure, resulting
in severe personal injury, death or
substantial property damage.
Leaks must be repaired at once.
Failure to do so can damage boiler,
resulting in substantial property
damage.
petroleum-based
Do not use
ing or sealing compounds in boiler
system. Severe damage to boiler
will occur, resulting in substantial
property damage.
.
.
.
.
clean-
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents