2.4 Inspecting and Unpacking Each Cabinet

The first task in preparing for installation is inspecting and unpacking each cabinet.
Cabinets arrive covered with protective packaging material as shown in Figure 2-1.
9315 UPS (300–500 kVA) Installation Manual S 164201118 Rev H www.powerware.com
EATON Powerware
®
Packaging
Figure 2-1. Cabinet as Shipped, with Outer Packaging−Rear View
1. Carefully inspect the outer packaging for evidence of damage during transit.
Do not install a damaged cabinet. Report any damage to the carrier and your service
representative immediately.
2. Use a forklift or other material handling equipment to move the cabinet to a
convenient unpacking area. Insert the forklift jacks between the foam cushions on
the bottom of the unit.
Do not tilt cabinets more than 10° from vertical.
3. Set each pallet on a firm, level surface, allowing a minimum clearance of
4.6m (15 ft) on each side for removing the cabinets from the pallets.
4. Cut the steel bands around each cabinet.
5. Remove the protective cardboard covering from the cabinets, cutting where
indicated, using a knife blade no longer than 25 mm (1").
6. Remove the plastic bag and foam packing material, and discard or recycle them in
a responsible manner.
Outer
C A U T I O N
C A U T I O N
Getting Started
Foam Cushion
2−3