Procedure 1 Message Check; Procedure 1; Message Check - Toshiba Satellite Pro T110DD Maintenance Manual

Personal computer
Table of Contents

Advertisement

Chapter 2 Troubleshooting Procedures

Procedure 1

Message Check

When the power is turned on, the system performs the Power on Self Test (POST) installed
in the BIOS ROM. The POST tests each IC on the system board and initializes it.
 If an error message is shown on the display, perform Check 1.
 If there is no error message, go to Procedure 2.
 If Free-DOS or Windows is properly loaded, go to Procedure 4.
If one of the following error messages is displayed on the screen, press the F2 key
Check 1
as the message instructs. These errors occur when the system configuration
preserved in the RTC memory (CMOS type memory) is not the same as the actual
configuration or when the data is lost.
If you press the F2 key as the message instructs, the SETUP screen appears to set
the system configuration.
Satellite T110D / Satellite Pro T110D / PORTEGE T110D Maintenance Manual (960-Q08)
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite t110ddPortege t110dd

Table of Contents