Heat & Glo SL-350TRS-CE-D Installer's Manual page 27

Fireplace
Hide thumbs Also See for SL-350TRS-CE-D:
Table of Contents

Advertisement

NOTE
WARNING:
!
FOLLOW NA TIONAL REGULATIONS
AND CODES OF PRACTICE FOR
MINIMUM CLEARANCES FROM GAS
TERMINALS, AND PLACEMENT OF GAS
TERMINAL.
This also pertains to vertical flue systems installed
on the outside of the building.
TERMINATION
CAP
TERMINATION
CAP
Roof Pitch
flat to 6/12
6/12 to 7/12
over 7/12 to 8/12
over 8/12 to 9/12
over 9/12 to 10/12
over 10/12 to 11/12
over 11/12 to 12/12
over 12/12 to 14/12
over 14/12 to 16/12
over 16/12 to 18/12
over 18/12 to 20/12
over 20/12 to 21/12
* 91.4 cm minimum in snow regions
u
Figure 25. Minimum Height from Roof to Lowest
Discharge Opening
61 cm
51 cm
VERTICAL
(For DVP Series)
WALL
LOWEST
DISCHARGE
OPENING
X
30.5 cm
ROOF PITCH
IS X/ 30.5 cm
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
H (min.) cm
30.5*
38*
45.75*
61*
76.25*
99
122
152.5
183
213.5
228.75
244
27

Advertisement

Table of Contents
loading

Table of Contents