Downflow Installation - Lennox G40DF Series Installation Instructions Manual

G40df(x) series
Hide thumbs Also See for G40DF Series:
Table of Contents

Advertisement

EQUIPMENT IN CONFINED SPACE
(All Air Through Ventilated Attic)
CHIMNEY
OR GAS
VENT
OUTLET
AIR
FURNACE
NOTE−The inlet and outlet air openings shall each have a
free area of at least one square inch (645 mm
Btu (1.17 kW) per hour of the total input rating of all equip-
ment in the enclosure.
FIGURE 4
CHIMNEY
OR GAS
VENT
FURNACE
NOTE − Each air duct opening shall have a free area of at least
2
one square inch (645 mm
) per 2,000 Btu (.59 kW) per hour of
the total input rating of all equipment in the enclosure. If the
equipment room is located against an outside wall and the air
openings communicate directly with the outdoors, each open-
ing shall have a free area of at least one square inch (645 mm
per 4,000 Btu (1.17 kW) per hour of the total input rating of all
other equipment in the enclosure.
FIGURE 5

Downflow Installation

Downflow unit installs in three ways: on noncombustible
flooring, on combustible flooring using an additive base, or
on a reverse−flow cooling cabinet. Do not drag the unit
across the floor.
ALL AIR FROM OUTSIDE
VENTILATION LOUVERS
(Each end of attic)
INLET AIR
(Ends 12 in.
above bottom)
WATER
HEATER
2
) per 4,000
EQUIPMENT IN
CONFINED SPACE
ALL AIR FROM
OUTSIDE
WATER
HEATER
OUTLET AIR
INLET AIR
2
)
Installation on Noncombustible Flooring
1 − Cut floor opening keeping in mind clearances listed on
unit rating plate. Also keep in mind gas supply connec-
tions, electrical supply, flue and air intake connections
and sufficient installation and servicing clearances.
See table 1 for correct floor opening size.
2 − Flange warm air plenum and lower the plenum into the
opening.
3 − Set the unit over the plenum and seal the plenum to
the unit.
3 − Ensure that the seal is adequate.
NONCOMBUSTIBLE FLOOR OPENING SIZE
Model No.
A Cabinet (14.5")
B Cabinet (17.5")
C Cabinet (21")
D Cabinet (24.5")
NOTE − Floor opening dimensions listed are 1/4 inch (6 mm) larger than
the unit opening. See figure 1.
Installation on Combustible Flooring
1 − When unit is installed on a combustible floor, an addi-
tive base must be installed between the furnace and
the floor. The base must be ordered separately for the
following cabinet sizes:
A cabinet 14.5" − # 11M59
D
B cabinet 17.5" − # 11M60
D
C cabinet 21" − # 11M61
D
D cabinet 24.5" − # 11M62
D
See table 2 for opening size to cut in floor.
The furnace and additive base shall not be installed
directly on carpeting, tile, or other combustible ma-
terial other than wood flooring.
The furnace and additive base shall not be installed
directly on carpeting, tile, or other combustible ma-
terial other than wood flooring.
ADDITIVE BASE FLOOR OPENING SIZE
Model No.
A Cabinet (14.5")
B Cabinet (17.5")
C Cabinet (21")
D Cabinet (24.5")
NOTE − Floor opening dimensions listed are 1/4 inch (6 mm) larger than
unit opening. See figure 1.
Page 8
TABLE 1
Front to Rear
Side to Side
in.
mm
in.
19 − 3/4
502
13 − 1/4
19 − 3/4
502
16 − 1/4
19 − 3/4
502
19 − 3/4
19 − 3/4
502
23 − 1/4
CAUTION
TABLE 2
Front to Rear
Side to Side
in.
mm
in.
22
559
15 − 3/4
22
559
18 − 3/4
22
559
22 − 3/4
22
559
25 − 3/4
mm
337
413
502
591
mm
400
476
578
654