- ^ — "\f ^^^^\\
/J
ijy
-^z^r^^
If M.
/
/
jS/Ki/
Jf2/®
®
/
«S
BELT DRIVE
EAS00317
REMOVING THE PRIMARY SHEAVE
1. Remove:
8primary sheave nut 1
8plate washer
8oneway clutch
8primary fixed sheave 2
NOTE:
While holding the primary fixed sheave with the
rotor holding tool 3 , loosen the primary fixed
sheave nut.
Rotor holding tool
90890-01235 (YU-01235)
EAS00318
REMOVING THE SECONDARY SHEAVE AND
V-BELT
1. Remove:
8secondary sheave nut 1
8clutch housing 2
NOTE:
While holding the clutch housing with the sheave
holder 3 , loosen the secondary sheave nut.
y-
Sheave holder
90890-01701 (YS-01880-A)
2. Loosen:
8clutch carrier nut
cC
Do not remove the clutch carrier nut at this
stage.
NOTE:
While holding the clutch carrier with the rotor
holding tool 1 , loosen the clutch carrier nut one
full turn with the socket wrench 2 .
f,
Rotor holding tool
90890-01235
YU-01235
Socket wrench(39mm)
90890-01493
5-44
%m
ENG