Restore To Normal Operation After "Total Off - GE LP 33 Series Operating Manual

10 – 20 – 30 kva 400 vac ce / series 4
Hide thumbs Also See for LP 33 Series:
Table of Contents

Advertisement

8.1.5

Restore to normal operation after "total off"

NOTE !
Make sure the UPS to be status of the activation of "total off", i. e. Q1 closed, Q2 open
and the battery fuses F9, F10, F11 connected.
View of the LCD screen after pressing the button "total off":
All Contactors are open.
Booster, inverter and Static-Switch shutdown.
1.
Reset "total off".
Restore the command "total off" by entering the screen:
MENU/RESET TOTAL OFF
The load is supplied by the mains through the automatic
bypass.
The booster starts automatically.
The LCD screen must display the status:
APPLICATION ON BYPASS
2.
Switch ON the inverter by entering the screen:
MENU/COMMAND MENU/INVERTER ON
The LCD screen must display the status: APPLICATION ON UPS
Modifications reserved
OPM_LPS_33E_10K_30K_4GB_V030.doc
END OF PROCEDURE
LP 33
20kVA
APPLICAT. SUPPLY OFF
= 0%
LED TEST
RESET TOTAL OFF
LP 33
20kVA
APPLICATION ON BYPASS
= 70%
COMMAND MENU
INVERTER ON
INVERTER OFF
LP 33
20kVA
APPLICATION ON UPS
= 70%
Operating Manual LP 33 Series / 10-20-30 kVA
*
*
Page 61/85