Start-Up Following The Operation On Maintenance Bypass (Q2) - GE LP 33 Series Operating Manual

10 – 20 – 30 kva 400 vac ce / series 4
Hide thumbs Also See for LP 33 Series:
Table of Contents

Advertisement

8.2.3

Start-up following the operation on maintenance bypass (Q2)

This procedure presupposes that the load is powered by the manual bypass switch:
• The inverter is switched OFF;
• The manual bypass switch Q2 is switched ON (Pos. I);
• The output switch Q1 is switched OFF (Pos. 0);
• The input fuses rectifier F1, F2, F3 and battery fuses F9, F10, F11 are removed.
1.
Insert the rectifier input fuses F1, F2, F3 and the battery fuses F9, F10, F11 (and eventual external
battery fuses) on each unit.
2.
Switch ON the output switch Q1 (Pos. I) on each unit.
3.
Only in case it has been previously activated (* present beside
the text RESET TOTAL OFF), restore the command total off
any one of the units
MENU/RESET TOTAL OFF
4.
Open the maintenance bypass switch Q2 (Pos. 0) on each
unit.
Verify, selecting the screen METERING/Udcp and Udcn, that the
booster voltage has reached about 400 VDC on each unit.
5.
Switch ON the inverter on each unit entering the screen:
MENU/ COMMAND MENU /INVERTER ON
(Do not start the next inverter until the sequence of the
previous one ends – about 10 seconds).
The load will be automatically transferred from mains to the
inverters as the needed power requested from the applied load
is achieved on inverter side.
The main screen of each unit will display:
APPLICATION ON UPS
Modifications reserved
OPM_LPS_33E_10K_30K_4GB_V030.doc
by entering the screen:
END OF PROCEDURE
LED TEST
on
RESET TOTAL OFF
Udcp=400V
Ubp=273V
Charge level
Autonomy
COMMAND MENU
INVERTER ON
INVERTER OFF
LP 33
20kVA P1
APPLICATION ON UPS
= 70%
Operating Manual LP 33 Series / 10-20-30 kVA
*
Udcn=400V
Ubn=273V F
= 100%
= 10min
*
Page 67/85