Relay Board - GE Advantium PSA1200R Technical Service Manual

Advantium 120 v (atc)
Hide thumbs Also See for Advantium PSA1200R:
Table of Contents

Advertisement

3. Check voltage between Smart Board CN103 pins
1 and 5 (18 VDC), pins 2 and 5 (12 VDC), pins 3
and 5 (12 VDC), pins 4 and 5 (5 VDC).
• If all voltages are correct, the Power Supply
is operating properly.
• If some but not all voltages are missing,
check wiring between the Power Supply
Board and the Smart Board. If wiring is OK,
replace the Power Supply Board.
• If all voltages are missing, go to step 4.
4. Check voltage between the double wire in the
connector that connects to Relay Board RY14
and the output of the Bottom TCO (yellow and
black wires).
• If 120 VAC is not present, see
troubleshooting step 3.
• If 120 VAC is present, check line and neutral
wiring to the Power Supply Board. If OK,
replace the Power Supply Board.
Disassembly
To remove the Power Supply Board:
1. Remove the Outer Cover. (See
2. Disconnect the 2 wire harnesses from the Power
Supply Board.
3. Remove the Phillips-head screw and ground
wire from the oven frame.
4. Remove the 2 Phillips-head screws that attach
the Power Supply Board to the Air Tunnel Inlet.
,
Bottom TCO
.)
Outer Cover
Disconnect
Disconnect
– 28 –

Relay Board

RY7
RY9
RY11
RY12
RY14
Note: Where applicable, board callout arrows
identify pin #1.
Location (See
Control Boards and Panel
.)
Connections
Used for load switching, but also contains
voltage compensation circuits and the buzzer.
Relays are switching neutral to loads.
Heat source relays require:
Relay Enable Voltage (5 VDC between CN01
pins 4 and 28.)
Relay Operating Voltage (12 VDC between
CN01 pins 2 and 4.)
Relay Activate Signal (5 VDC between
the active relay, see Relay Chart in
troubleshooting section), and CN01 pin 4.
CN01
CN16
CN6
CN5
(Continued Next Page)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advantium psa1201rAdvantium csa1201r

Table of Contents