Performing The Verification Tests; Turn-On Checkout - Agilent Technologies 6631B User Manual

Dynamic measurement dc source/system dc power supply
Hide thumbs Also See for 6631B:
Table of Contents

Advertisement

B - Verification and Calibration
+
DC
Voltmeter
-
+
DC
Ammeter
-

Performing the Verification Tests

NOTE:
The verification procedure can only be performed using the SCPI language commands.
Use either the front panel
SYSTem:LANGuage command to change the programming language to SCPI.
The following procedures assume you understand how to operate the dc source from the front panel as
explained in chapter 5.
When performing the verification tests from an GPIB controller, you may have to consider the relatively
slow settling times and slew rates of the dc source as compared to computer and system voltmeters.
Suitable WAIT statements can be inserted into the test program to give the dc source time to respond to
the test commands.
Perform the following tests for operation verification in the order indicated.

1. Turn-On Checkout

2. Voltage Programming and Measurement Accuracy
3. Current Programming and Measurement Accuracy
54
+ 240 VDC MAX TO
-
+S
+
-
-S
Current
monitor
A.
+ 240 VDC MAX TO
-
+S
+
-
-S
Load
resistor
-
+
External
C.
DC supply
Figure B-1. Verification & Calibration Test Setup
Address
+
DC
Ammeter
-
B.
Load Resistor
400
6631B
1.1K 6632B
& 66332A
2.5 K 6633B
5 K
6634B
+
DC
Current
Voltmeter
monitor
-
D.
key to access the LANG command, or use the
+ 240 VDC MAX TO
-
+S
+
-
-S
Load
resistor
+ 240 VDC MAX TO
-
+S
+
-
-S
+
-
External
DC supply

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6633b66332a6634b6632b

Table of Contents