Leak Test; Pilot Adjustment (If Necessary); Steps For Finalizing The Installation - Travis Industries Lopi Northfield Owner's Manual

Direct vent freestanding stove
Table of Contents

Advertisement

Installation

Steps for Finalizing the Installation

1.
Remove the glass (see page 29).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected once it
enters the firebox, ensuring gas does not build up.
3.
Make sure the accent light bulb is in place.
NOTE: Take care to not touch the bulb with your fingers – use a cloth or paper towel).
4.
Install the four AA batteries (included in the owner's pack) into battery holder (see the illustration below). The AA
batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included in the
owner's pack) into control panel light assembly (see the illustration below). Velcro is used to secure the 9v battery.
Swing the control
cover down to
access the batteries.
© Travis Industries
(for qualified installers only)
Battery Holder for
Control Panel Lights
4091120
27
AA
Battery
Holder
AA Battery Tray
100-01239_000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

AvalonLopi northfield gs

Table of Contents