Heat & Glo CURVE 100 Owner's Manual page 8

Hide thumbs Also See for CURVE 100:
Table of Contents

Advertisement

Curve 100
Fig. 4
CORNER POSITIONING (45°)
Table 2
A
B
C
D
E
F
FIREBOX INSTALLATION
1. If a separate floor protector is being used position now. Place the firebox on the floor protector to suit the minimum
installation clearances. (See Fig 3 or 4).
2. Seismically restrain the firebox and the floor protector to the floor.
3. Fit 2 x 6mm fixings suitable for the floor material. DO NOT over tighten.
4. Fit timber trim pedestal edging to front and back of base (optional).
8
F
DESCRIPTION
Pioneer Double Flue Mounted Shield Universal
Shall be Fitted
Min. clearance from firebox corner to corner walls
Min. distance from center of spigot to corner walls
Min. distance from corner wall to floor protector front
Min. floor protector projection from corner wall
Min. floor protector front width
Min. overall floor protector depth
B
FLOOR PROTECTOR
E
Heat & Glo • 7076-250
C
A
D
With Double
Flue Shield
Fitted
225
444
968
615
500
1119
5/2013

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents