Curve 100
FLUE PENETRATION
Fig. 8
FLUE PENETRATION
Un-tested flue systems, as per AS/NZS 2918:2001, 4.6.3 (b)
AS/NZS2918:2001
Un-tested flue with sloped ceiling
penetration greater than 30° from
horizontal
A = 25mm
4.6.3(b)
Fig 4.6 = downward distance of
casing and 3 x ø flue distance of
the ceiling plate
Batten
Ceiling
AS/NZS2918:2001
Fig. 10
Fig. 8
Un-tested flue with sloped ceiling
MINIMUM HEIGHT OF FLUE SYSTEM EXIT
penetration greater than 30° from
horizontal
A = 25mm
4.6.3(b)
Fig 4.6 = 3 x ø flue from active flue
to heat sensitive surface
3000
Batten
increase as necessary
until nothing within
3000mm of flue top
Any nearby structure
Ceiling
14
Approved Flashing
A
A
3 x Ø flue pipe
flue pipe
Ø
A
A
flue pipe
Ø
Ceiling
Fig. 9
FLUE PENETRATION
ADD Cowl
Fig. 7
AS/NZS2918:2001
Casing Cover
Un-tested flue with sloped ceiling
penetration greater than 30° from
Spider Bracket
horizontal
A = 25mm
4.6.3(b)
Fig 4.6 = 3 x ø flue from active flue
to heat sensitive surface
Ceiling Plate
ADD Cowl
Casing Cover
Spider Bracket
3000
More than 3000
or less
Approved Flashing
600 min.
Ceiling Plate
Heat & Glo • 7076-250
3 x Ø flue pipe
flue pipe
1.QF.1F
Batten
A
flue pipe
Ceiling
3000
Ø
ADD Cowl
Casing Cover
Spider Bracket
Approved Flashing
A
Ceiling Plate
Ø
increase from 1000mm
minimum until clear within
3000mm of flue top
5/2013