Kohler K9J Service Manual page 70

Single cylinder engine
Table of Contents

Advertisement

Figure 7-23. Winding Rope Onto Pulley.
7.12
18. Slip the handle and rope retainer onto rope.
Tie a single knot at the end of rope and install
rope retainer into handle. Refer to Figure
7-12.
19. Untie the slip knot and pull the handle out until
the rope is fully extended. Slowly retract the
rope into the starter. If the spring has been
properly tensioned, the rope will fully retract
until the handle hits the housing.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kj4jK30jK32jK34jKj6jKjbj ... Show all

Table of Contents