Vertical Air Terminal Installation - Napoleon GDS50N Installation And Operating Instructions Manual

Natural & propane gas
Table of Contents

Advertisement

22

4.2.4 VERTICAL AIR TERMINAL INSTALLATION

MAINTAIN A MINIMUM 2" SPACE BETWEEN THE AIR INLET BASE AND THE STORM COLLAR.
Fasten the roof support to the roof using the screws provided. The
A.
roof support is optional. In this case the venting is to be adequately
supported using either an alternate method suitable to the authority
having jurisdiction or the optional roof support.
Stretch the inner fl ex pipe to the required length. Slip the
B.
inner fl ex pipe a minimum of 2" over the inner pipe of the air
terminal connector and secure with 3 #8 screws. Seal using
a heavy bead of high temperature sealant W573-0007 (not
supplied).
Repeat using the outer fl ex pipe, using a heavy bead of
C.
high temperature sealant W573-0002 (not supplied).
Thread the air terminal connector / vent pipe assembly down through
D.
the roof. The air terminal must be positioned vertically and plumb.
Attach the air terminal connector to the roof support, ensuring that the
top of the air terminal is 16" above the highest point that it penetrates
the roof.
Remove nails from the shingles, above and to the sides of the air
E.
terminal connector. Place the fl ashing over the air terminal connector
leaving a min. 3/4" of the air terminal connector showing above
the top of the fl ashing. Slide the fl ashing underneath the sides and
upper edge of the shingles. Ensure that the air terminal connector
is properly centred within the fl ashing, giving a 3/4" margin all
around. Fasten to the roof. Do not nail through the lower portion
of the fl ashing. Make weather-tight by sealing with caulking. Where
possible, cover the sides and top edges of the fl ashing with roofi ng
material.
Aligning the seams of the terminal and air terminal connector,
F.
place the terminal over the air terminal connector making sure
the vent pipe goes into the hole in the terminal. Secure with the
three screws provided.
Apply a heavy bead of weatherproof caulking 2" above the
G.
fl ashing. Install the storm collar around the air terminal and slide
down to the caulking. Tighten to ensure that a weather-tight seal
between the air terminal and the collar is achieved.
If more vent pipe needs to be used to reach the appliance see "HORIZONTAL
H.
AIR TERMINAL INSTALLATION" section.
W415-0098 / E / 06.28.10
WARNING
!
ROOF SUPPORT
INNER PIPE
AIR
TERMINAL
CONNECTOR
HIGH
TEMPERATURE
SEALANT
INNER FLEX PIPE
OUTER FLEX PIPE
AIR INLET
2"
BASE
CAULKING
STORM COLLAR
WEATHER
SEALANT
FLASHING
24.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gds50pGs50nGs50p

Table of Contents