Electrical Connections; Wiring Harness - Goodman GMV95 Installation Instructions Manual

Two-stage gas-fired warm air furnace
Table of Contents

Advertisement

FRONT COVER
DRAIN PORT
RED HOSE
CLAMP
HOSE A
HOSE B
SIDE PANEL
GROMMET
HOLES
TUBES 2
DRAIN TRAP
Horizontal Connections - Right Side Down
(Upflow Shown, Counterflow Similar)
8. Insert approximately one inch of each Tube 2 through the
right down side panel grommet holes. Secure tubes to
Hose A and Hose B using green hose clamps. Ensure
hoses and tubes maintain a downward slope for proper
drainage and are not kinked or bound.
For details concerning mounting of the drain trap, refer to Section
X, Condensate Drain Lines and Drain Trap - Upright Drain Trap
Mounting.
L
S
D
EFT
IDE
OWN
Horizontal installations with the left side panel down will require
drain hoses to be connected to the left side front cover drain port
and the side drain port on the rubber elbow.
1. Remove the rubber plug from the coil front cover left (down)
side drain port.
2. Relocate the front cover pressure switch hose connection
from the right side (as shipped) pressure tap to the left
(down) side tap. The pressure switch hose must be
connected to the down side to guard against blocked drain
conditions. Cut hose to appropriate length to minimize
sagging. Plug right (unused) pressure tap with plug
removed from left side.
3. Secure Hose A to front cover drain port with a red hose
clamp. Route hose to rear left (down) side panel grommet
holes. NOTE: For left side drainage, grommets must be
relocated to left side panel.
FRONT
COVER
PRESSURE
TAP
LEFT SIDE
FRONT COVER
PANEL
DRAIN PORT
RED HOSE CLAMP
Horizontal Connections - Left Side Down
(Upflow Shown, Counterflow Similar)
4. Remove the rubber cap from the side drain port on the rubber
elbow.
FRONT
COVER
PRESSURE
RUBBER
TAP
ELBOW
RIGHT
SIDE
PANEL
RUBBER ELBOW
GREEN
DRAIN PORT
HOSE
TUBE 1
RED HOSE
CLAMP
CLAMP
(3 PLACES)
INDUCED
DRAFT BLOWER
DRAIN PORT
HOSE B
HOSE A
GREEN HOSE
CLAMPS
(3 PLACES)
TUBE(S) 2
DRAIN TRAP
SIDE PANEL
GROMMET
HOLES
5. Secure the short end of Hose B to rubber elbow side drain
port using a green hose clamp. NOTE: For left side drainage,
route hose to far left (down) side panel grommet holes.
NOTE: Horizontal left side connections (when using new
side port drain elbow) does not require connecting a hose
to the induced draft blower housing.
6. Cut 5 1/2 inches straight length from the long end of each
Tube 2.
7. Insert approximately one inch of each Tube 2 through left
side panel grommet hole. Secure tubes to Hose A and
Hose B with a green hose clamps.
reach bottom of trap. Ensure hoses and tubes maintain a
downward slope for proper drainage and that they are not
kinked or binding.
For details concerning mounting of the drain trap, refer to Section
X, Condensate Drain Lines and Drain Trap - Upright Drain Trap
Mounting.
H
D
T
ORIZONTAL
RAIN
RAP
1. Position the drain trap against side panel with drain tubes
inserted into trap. Note that the trap may be orientated with
the outlet facing either the furnace's top cover or base pan.
2. Secure drain trap to side panel at the dimples or crosshairs
located on either side of the grommet drain holes.
3. Confirm that tubes reach bottom of drain trap and that all
hoses maintain a downward slope and are not kinked or
binding.
4. Attach PVC drain line to drain trap outlet with either a 90°
elbow or coupling.
XI. ELECTRICAL CONNECTIONS
HIGH VOLTAGE!
T
O AVOID THE RISK OF ELECTRICAL SHOCK
THE UNIT MUST BE POLARIZED AND GROUNDED
HIGH VOLTAGE!
T
O AVOID PERSONAL INJURY OR DEATH DUE TO
,
ELECTRICAL SHOCK
DISCONNECT ELECTRICAL POWER
BEFORE SERVICING OR CHANGING ANY ELECTRICAL
.
WIRING
L
ABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING
. W
CONTROLS
IRING ERRORS CAN CAUSE IMPROPER AND
. V
DANGEROUS OPERATION
.
SERVICING
W
H
IRING
ARNESS
The wiring harness is an integral part of this furnace. Field alter-
ation to comply with electrical codes should not be required. Wires
are color and number coded for identification purposes. Refer to
the wiring diagram for wire routings. If any of the original wire as
supplied with the furnace must be replaced, it must be replaced
with wiring material having a temperature rating of at least 105°C.
Any replacement wiring must be copper conductor.
21
NOTE: Tube must
M
(L
R
OUNTING
EFT OR
IGHT
WARNING
,
WIRING TO
.
WARNING
CAUTION
ERIFY PROPER OPERATION AFTER
S
P
)
IDE
ANEL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gcv9

Table of Contents