either pipe must be reduced by 0.90 m or 1,65 m
respectively.
Referring to Fig. 6.6, the minimum length required
for pipes a and b is 0.3 m.
Maximum equivalent length "a+b" of 40 metres
can be achieved utilising extensions.
Fig. 6.6
Vertical--- roof kit (Fig. 6.7)
Co--- axial 80/125 mm
This kit allows vertical termination of the flue pipe
through the roof. The kit is 1.2 min length. Exten-
sion pieces (Co--- axial) are also available which al-
lows the flue system to be extended to a total
overall maximum permissible length of 10 m.
Optional 45û and 90û elbows can be used to offset
the flue route.
Each additional elbow reduces the overall accept-
able length of the flue system as follows:
45û reduce length by 0.5 m.
90û reduce length by 1 m.
max = 10 m
Fig. 6.7
26
6.9
Connection to the electricity supply
1 Remove the front panel of the case (see the
2 Remove the screws I and J (Fig. 6.8).
3 Loosen the screws K.
90û=--- 1,65 m
45û=--- 0,90 m
J
Fig. 6.8
4 Remove the side panels or move the lower part
90û=--- 1m
45û=--- 0,5m
Fig. 6.9
5 Loosen the screws L and remove the service

Electrical connections

section 8.2 in this manual).
K
of the side panels as indicated in Fig. 6.9 and
pull the control panel.
When completely pulled out, the panel can ro-
tate 45û downwards to facilitate the operations
on the internal parts.
panel (Fig. 6.10).