Maintenance; Warnings; Dismantling The External Panels; Emptying The D.h.w. System - Biasi RIVA ADVANCE HE M110.24SM User Manual And Installation Instructions

Wall hung, fan flue, room sealed, high efficiency gas boiler
Table of Contents

Advertisement

8

Maintenance

8.1

Warnings

The procedures detailed in this chapter must
be carried out only by a professionally
qualified person. Thus you are advised to
contact an Authorised Service Agent.
For Ireland (IE), the servicing work must be
carried out by a competent Person
For efficient and continuous operation of the
boiler you are advised to have, at least once a
year, maintenance and cleaning done by an
Approved Service engineer.
Isolate the appliance from the electricity
supply by turning off the fused spur isolation
switch adjacent to the appliance and turn off
the gas cock, before carrying out any pro-
cedures, whatsoever, for cleaning, mainten-
ance, opening or dismantling boiler panels.
8.2
Dismantling the external
panels
Front panel
1 Loosen the three screws A (Fig. 8.1).
2 Lift and remove the panel B.
B
Fig. 8.1
Side panels
3 Loosen the screws C. Bring the bottom of the
panels away from the boiler and lift them, free-
ing them from the top hooks (Fig. 8.2).
Air--- Flue exhaust
Sampling points
A
C
Fig. 8.2
8.3

Emptying the d.h.w. system

1 Turn off the d.c.w. inlet isolating valve (13 in
Fig. 8.3) and turn on the hot water taps and any
drain cocks.
16
13
Fig. 8.3
8.4

Emptying the c.h. system

1 Close the c.h. isolating valves (12 and 16 in
Fig. 8.3).
2 Open the central heating drain cock (26 in
Fig. 8.4).
Closed position
12
14
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents