To install the component:
Back up all data.
1.
Close all applications.
2.
Power down the server (on page 20).
3.
CAUTION:
In systems that use external data storage, be sure that the server is the first unit to
be powered down and the last to be powered back up. Taking this precaution ensures that
the system does not erroneously mark the drives as failed when the server is powered up.
Do one of the following:
4.
Open or remove the tower bezel, as needed
o
Extend the server from the rack (on page 21).
o
Remove the access panel (on page 21).
5.
Install the FBWC module.
6.
Connect the cable.
7.
("Open or remove the tower
Hardware options installation 71
bezel" on page 20).