Installation; Operation - Wells M4200 Owner's Manual

Wells m4200 convection oven owner's manual
Hide thumbs Also See for M4200:
Table of Contents

Advertisement

A.
UNPACKING AND INSPECTION
1. Carefully remove equipment from the carton. Remove all protective plastic film and
packaging materials. Remove accessories from the OVEN CAVITY before connecting
electrical power or otherwise performing any installation procedures.
NOTE: DO NOT discard the CARTON and other PACKAGING MATERIAL until you have
inspected the appliance for hidden damage and tested it for PROPER OPERATION.
Refer to SHIPPING DAMAGE CLAIM PROCEDURE on the inside front cover of this manual.
2. Read all instructions in this manual carefully before starting installation . READ AND
UNDERSTAND ALL LABELS AND DIAGRAMS ATTACHED TO THE APPLIANCE.
3. Carefully account for all components and accessories before discarding packing materials.
Components and accessories are shipped in the oven cavity . Store the accessories in a
convenient place for later use:
COMPONENTS
ACCESSORIES
B.
SERVICE TECHNICIAN INSTALLATION NOTES
1. Installation and start up should be performed by an authorized installation company.
Installer must record installation particulars on the CUSTOMER SERVICE DATA form
on page 23 of this manual.
2. Verify that this equipment installation is in compliance with the specifications listed in this
manual and with local code requirements.
It is the RESPONSIBILITY OF THE INSTALLER to check with the AUTHORITY HAVING
JURISDICTION, in order to verify compliance with local codes and ordinances for THIS
SPECIFIC EQUIPMENT INSTALLATION.
INSTALLATION INSTRUCTIONS
3 ea.
OVEN RACKS
1 ea.
RACK SUPPORT
1 ea.
FAN BAFFLE
1 ea.
LITERATURE PACKAGE
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents