Overview: Installation steps

This chapter contains an overview of the steps necessary to install your
Server Blade. The cross-references take you to the sections containing more
detailed information on the relevant installation step:
Ê First read the
section "Safety
Ê Unpack the Server Blade, check the contents of the package for visible
transport damage and check whether the items delivered correspond to the
details on the delivery note (see section
Ê Transport the server blade to the place where you want to set it up.
Ê Make sure that you have all necessary manuals (see
PDF files if required.
Ê Install the server blade in your BX900 system unit (see section
page
32).
Ê Familiarize yourself with the controls and indicators on the front of the
server blade (see chapter
Ê Install the operating system and applications on the server blade.
When doing so, you have the following options:
– Clone the server blade from a remote image server using the ServerView
Deployment Manager.
This procedure is recommended if the following conditions are met:
– ServerView Deployment Manager software is available.
– You have a suitable clone image.
– A Deployment Server and LAN connection are available.
– Remote installation with ServerStart/Installation Manager
This installation method is recommended if you have a LAN connection
and a DHCP server (Deployment Server) available, but the cloning
requirements are not met.
BX920 S2
chapter "Important notes"
instructions".
5
from
Operating Manual
from
page
4.1 on page
page
39).
19, particularly the
32).
page
8); print out the
4.2 on
17