Complete Block Assembly - Weil-McLain 88 Manual

Water & steam boilers 2 series
Hide thumbs Also See for 88:
Table of Contents

Advertisement

Weil-McLain 88 Water and steam boilers — Series 2 —

Complete block assembly

Install burner mounting plate on front
section
1.
Install four ½" x 3½" studs to secure burner mounting plate to
section:
a.
Thread and lock together two nuts on rounded end of stud.
Thread flat end of stud into one of four holes located around
opening.
b.
Remove nuts.
c.
Repeat steps a and b for remaining studs.
2.
Install burner mounting plate:
1
a.
Apply
/
" continuous bead of sealing rope adhesive in groove
8
around opening in section.
b.
Position ½" sealing rope in groove. Overlap ends at least one
inch.
c.
Install burner mounting plate with part number and the word,
"
" positioned at top. Use ½" washers and nuts.
Install observation port assemblies on front
and back sections
1.
Install front observation port assembly:
1
a.
Apply
/
" continuous bead of sealing rope adhesive in groove
8
on observation port.
Insert HXT-bars through cleanout openings as shown below (omit the bottom, blue-tipped, HXT-bar in the opening
between the front section and the first intermediate section)
12
for Gas, Light Oil, & Gas/Light Oil-Fired Burners
b.
Position
3
/
" sealing rope in groove.
8
c.
Secure assembly to section. Use 10-32 x ¾"
truss-head screws.
2.
Repeat above steps for back observation port as-
sembly.
Insert HXT-bars
1.
See
Figure 12, page 12.
2.
Flue HXT-bars are identified by painted ends. They
must be inserted as shown, with the HXT-bars in
the sequence:
position
-tipped, HXT-bar 24 inches long —
place on the top row of pins.
position
-tipped HXT-bar, 26 inches long —
place on the first row of pins below the top
clean-out plate boss.
position
-tipped HXT-bar, 34 inches long —
place on the first row of pins below the
bottom cleanout plate boss.
Part No. 550-100-068/1009