Connect Steam Boiler Piping - Weil-McLain 88 Manual

Water & steam boilers 2 series
Hide thumbs Also See for 88:
Table of Contents

Advertisement

Weil-McLain 88 Water and steam boilers — Series 2 —

Connect steam boiler piping

General steam piping information:
1.
Hartford loop piping arrangement and wet return are required for
steam boilers. Use the Hartford loop for both pumped-return and
gravity-return systems.
2.
Maintain 24-inch minimum from waterline to bottom of header (63"
from bottom of section).
3.
When using condensate receiver, feed pump must be energized by
boiler-mounted pump controller.
4.
Install piping:
a.
Install piping as shown on
ers. See page 19 for additional requirements when piping multiple
boilers.
b.
Return pipe sizing.
Pumped return — Size return piping by pump.
Gravity return — Size gravity return same as Hartford loop
equalizer pipe size.
c.
Drain valve — Install system drain valve in lowest part of return
piping close to boiler. See Figure 17, page 15, for sizing.
d.
Cold water fill piping — Connect cold water fill piping as shown in
Figure 20. Also shown are recommended valves and water meter,
if used. Water meter will detect added makeup water, indicating
leaks in system.
e.
Condensate return piping:
Satisfactory operation of any steam heating system depends on
adequate return of condensate to maintain steady water level.
Avoid adding excessive amounts of raw make-up water.
Where condensate return is not adequate, a low water cutoff
with pump control, condensate receiver, and condensate boiler
feed pump should be installed.
See Figure 21 for piping and Figure 22 for sizing.
Condensate receiver capacity required
Boiler
I=B=R gross output
model number
(lbs steam per hour)
488
810
488R
794
1084
588
1358
688
1632
788
888
1904
988
2170
988R
1991
1088
2452
1088R
2304
1188
2724
1288
3000
1388
3270
1488
3550
3820
1588
4090
1688
3980
1688R
1788
4370
1888
4640
Note 1 — Maximum time to when condensate returns to boiler — the longer the time for condensate to return, the larger the receiver must be.
16
page 17 through page 18 for single boil-
Gallons condensate
Minimum condensate receiver capacity (gallons) (Note 1)
per hour
15-minute boiler
operation
97
29
95
28
130
39
163
49
195
59
228
68
261
78
239
72
294
88
277
83
327
98
360
108
392
117
426
127
458
137
490
147
478
143
524
157
557
167
for Gas, Light Oil, & Gas/Light Oil-Fired Burners
Cold water fill piping
Condensate piping to boiler
30-minute boiler
45-minute boiler
60-minute boiler
operation
operation
58
87
57
85
78
117
98
147
117
176
137
205
157
235
145
217
176
265
166
249
196
294
216
324
235
353
255
383
274
412
294
441
287
430
314
471
334
501
Recommended condensate
feed pump capacity
GPM at 15 PSI
operation
116
3.2
114
3.1
156
4.3
196
5.4
234
6.5
273
7.6
313
8.7
289
8.0
353
9.8
332
9.2
392
10.9
432
12.0
470
13.1
511
14.2
550
15.3
588
16.4
574
15.9
629
14.5
668
18.6
Part No. 550-100-068/1009

Advertisement

Table of Contents
loading

Table of Contents