JVC GY-HD100E Service Manual page 48

Hd camera recorder
Hide thumbs Also See for GY-HD100E:
Table of Contents

Advertisement

No.
Item
ª
17
Sub cam
Arm gear 2 assembly,
( L19 )
Reference picture/drawing
º
Clutch lock lever assembly
31
( S2 )
38
40
39
Fig. 2-7-17(a)
Procedure
<Removal>
1) Remove the screw (S2) and take out the sub cam .
As L19 is engaged at the rear of the main deck
assembly while the phase is aligned, deviate the
phase in the direction of the arrow before removal.
20. This checking should be done after completing the
switching point adjustment.
Phase alignment
Fig. 2-7-17(b) Removing the Clutch Lock Lever
º
Assembly
<Attaching>
1) Align the phase correctly by referring to Fig. 2-7-
17(c), then attach by reversing the removal proce-
dure.
38
Phase
alignment
40
Align the phases of the arm gear 2 assembly
and clutch lock lever assembly
fitting the boss into the cam groove below, and
clamp with the screw.
Fig. 2-7-17(c) Attaching the Sub Cam
40
39
Phase
alignment
Phase
alignment
ª
º
, attach them by
2-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gy-hd101eGy-hd100u

Table of Contents