Ussc - Ashley 24AF Owner's Manual

Wood & coal burning furnace
Table of Contents

Advertisement

Your furnace is designed to be added on to existing duct
work and operate either with or without another heat source
such as a gas furnace. The following diagrams illustrate
acceptable ways of ducting your furnace.
Clearance to Combustible Materials
Your Furnace has been tested to determine the SAFE clear-
ances to combustible material. The clearances are printed
on the label located on the back of the furnace. The chart
on this page also states these minimum clearances. Make
sure you follow these when choosing your furnace loca-
tion.
Any hot air plenum connection to a furnace must be con-
structed of metal.
NOTE: INSTALL ONLY ON A NON-COMBUSTIBLE FLOOR.
EXISTING
FURNACE

USSC

18"
PLENUM
6"
12"
Clearance to Combustibles
Furnace to back wall
Furnace to side wall
Pipe to back wall
Pipe to side wall
Furnace to ceiling
Ductwork to ceiling
18"
3'
3'
18"
30"
18"
12"
SOLID FUEL
FURNACE
To connect a Solid Fuel Furnace to a chimney flue
pipe serving another appliance, it's suggested you check
local building codes.
30"
12"
18"
18"
30"
18-6-1"
6"
1"
EXISTING
FURNACE
Page 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

24ag24az

Table of Contents