Making Boiler Ready For Operation; Then Carry Out Start-Up Procedures - Buderus Logano G234X Installation And Service Instructions Manual

Gas boiler
Table of Contents

Advertisement

WARNING: Risk of fatal injury due to not observing the
start-up instructions and resulting incorrect operation!
▶ If these instructions are not followed, a fire or
explosion may result.
6.4

Making boiler ready for operation

STOP! First read the safety instructions on page 18 of these
instructions.
1. If the boiler is not commissioned directly after the installation:
carry out another leak test ( page 18). Wait five (5) minutes until all
gas residues have dissipated. Finally check whether there is any smell
of gas, including at floor level. If you smell gas, STOP! Seal leaks and
repeat the leak test.
If you do not smell gas, go to the next step.
2. Open the gas shut-off valve.
Commission the heating system with AquaSmart
The boiler is fully functional with the factory-installed AquaSmart
3. Switch on ON/OFF switch [1] ("ON" position). This turns on the boiler
with all its components.
4. Make sure that the room thermostat signals a heat requirement (set
thermostat at least 10 °F above room temperature).
Fig. 20 Switching on heating system (with AquaSmart
[1]
Main power switch
6.5

Then carry out start-up procedures.

The following commissioning work must be performed regardless of the
control unit type.
5. Look at the pilot burner through the inspection hole [1] in the burner
cover.
Logano G234X – 6 720 804 886 (2012/08)
Fig. 21 Inspection hole in the burner cover
[1]
6. Turn gas valve ON/OFF dial[1] counterclockwise to ON position.
TM
control
7. The burner control unit must generate ignition sparks towards the
TM
.
pilot burner. The pilot flame must appear and then ignite the main
burner.
If the main burner does not ignite, close the gas shut-off. Disconnect
heating system from the power supply and inform your customer
service technician or LP gas company.
8. If the main burner has ignited, the gas valve must be checked for leaks
with leak detector fluid. If no leaks are found, continue with step 10.
9. If leaks have been found, switch the ON/OFF switch on the gas shut-
off valve [1] clockwise to the OFF position. Disconnect heating
system from the power supply and set the thermostat to the lowest
setting.
Seal the leaks. Repeat steps 1 and 2.
For AquaSmart
Then repeat steps 7 to 10.
TM
)
Fig. 22 Gas valve
[1]
[2]
[3]
[4]
[5]
Placing the heating system in operation
Inspection hole
TM
control units, continue with steps 3 and 4.
ON/OFF dial (at ON position)
Screw plug for gas connection pressure test port
Safety screw for nozzle pressure setting
Screw plug for nozzle pressure test port
Safety screw for ignition nozzle pressure setting
6
19