ASS E MB LY S T E P 6
GUIDE RAIL
A) Open HARDWARE BAG FOR STEP 6.
B) Slide SPACER (G) into LOWER LINK ARM.
C) Place TEFLON WASHERS (F) on either side of SPACER (G). While holding TEFLON WASHERS (F) slide LOWER
LINK ARM into bottom end of LOWER HANDLEBAR.
D) Insert BOLT (E) into LOWER HANDLEBAR and secure using NUT (H).
C) Repeat on other side.
HARDWARE BAG FOR STEP 6 CONTENTS :
LOWER LINK ARM
TEFLON WASHERS
LOWER LINK ARM
TEFLON WASHERS (F)
BOLT (E)
60 mm
Qty: 2
TEFLON WASHER (F)
28 mm
Qty: 4
LOWER
HANDLEBAR
SPACER
LOWER HANDLEBAR
NUT (H)
BOLT (E)
SPACER (G)
NYLON NUT (H)
INSIDE DIAMETER:
8 mm
Qty: 2
SPACER (G)
44 mm axis
Qty: 2
13