Then Carry Out Start-Up Procedures - Buderus Logano G334 X Instructions Manual

Gas-fired boiler propane conversion kit instructions
Table of Contents

Advertisement

Start-up instructions
4.1.2 Placing heating system with Logamatic 2107 (accessory) in operation
The boiler is fully functional with the factory-installed
aquastat. The Logamatic 2107 control can also be
installed in addition to the factory-installed aquastat.
Switch on the heating system with the ON/OFF switch
on the control. The burner starts operating if heat is
required (
observe control service manual).
5. Make sure that heat is required at the control. Select
"Manual operation" (hand symbol) with the mode
selector switch.
6. Switch on ON/OFF switch ("I" position). Then
continue with step 7.
USER NOTE
After carrying out the instructions for
starting described below, the control must
be set to "AUT" mode (automatic
operation) with the mode selector.
4.2

Then carry out start-up procedures.

The following start-up procedures must be carried out
regardless of the control type.
7. Look at the igniter through the sight glass in the
burner housing.
We reserve the right to make any changes due to technical modifications.
Instructions for conversion kit for Logano G334 X gas-fired boiler • Issue 09/2005
Fig. 9
Switching on heating system (with Logamatic 2107
control)
1 Mode selection switch
2 ON/OFF switch
Fig. 10 Front view
1 Sight glass
4
1
2
1
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents