Ricoh A-C2 Service Manual page 52

Machine code: b003/b004/b006/b007
Table of Contents

Advertisement

26 January, 2001
[C]
[D]
9. Secure the finisher [A] (! x1).
10. Adjust the securing knobs [B] under the front and rear stands until the finisher
is perpendicular to the floor.
11. Install the shift tray [C] (snap ring x1).
NOTE: Make sure that the three pegs [D] fit into the slots [E] properly.
12. Connect the finisher cable [F] to the main machine.
13. Turn on the main power switch and check the finisher operation.
[F]
[E]
[B]
1-35
1000-SHEET FINISHER INSTALLATION
A681I706.WMF
[A]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A-c2 b003A-c2 b004A-c2 b006A-c2 b007

Table of Contents