Torch And Work Cable Connections - Hobart AirForce 250A Owner's Manual

Air plasma cutter and ice-12c torch
Table of Contents

Advertisement

6-3. Torch And Work Cable Connections

6
5
3
4
4
Tools Needed:
5/8 in
4
7
1
2
2
5
8
6
5
8
6
3
If torch or work cable needs to be
removed or replaced, proceed as
follows:
Turn power Off, and disconnect
input power plug from receptacle.
Remove wrapper from unit.
Torch Connections
Remove existing torch cable from
unit.
1
Strain Relief
2
Torch Cable
Insert cable through strain relief.
Slide strain relief nut onto torch
cable, but do not tighten.
3
Air Line Connector
Install air line connector onto
compressor fitting.
4
Plug PLG4/Receptacle RC4
Connect PLG4 to receptacle RC4
on circuit board PC1.
5
Female And Male Friction
Terminal RC11/ELECT
WHITE
Connect female friction terminal on
end of white leads to RC11/ELECT
WHITE.
6
Female And Male Friction
Terminal RC7/PILOT RED
Connect female friction terminal on
end red leads to RC7/PILOT RED.
Tighten strain relief nut.
Tighten strain relief around cable.
Work Cable Connections
Remove existing work cable from
unit.
7
Strain Relief
.
Be sure to allow some work
cable slack inside the unit.
Insert work clamp lead through
strain relief, and install strain relief
into front panel.
8
Work Lead Male Friction
Terminal
Connect work clamp lead to male
friction terminal labeled WORK
LEAD on circuit board PC1. Route
lead along torch lead bundle.
Ref. 803 936-A / Ref. 801 300-B / 199 088
OM-928 Page 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ice-12c torch

Table of Contents