PRE-USE CHECK LIST
1
Place the unit in a location near the final installation
area and follow the procedures below:
2
Open the stove and remove all the parts and articles
packed inside. Inspect all the parts and cast iron
body for shipping damage. Contact your dealer if
any irregularities are noticed.
3.
All safety warnings have been read and followed.
4.
This Owner's Manual has been read.
5.
Floor protection requirements have been met.
6.
Chimney connector is properly installed.
7.
The proper clearances from the stove and chimney
to combustible materials have been met.
8.
The masonry chimney is inspected by a profes-
sional and is clean, or the factory built metal chim-
ney is installed according to the manufacturer's
instructions and clearances.
9.
The chimney meets the required minimum height.
10.
All labels have been removed from the glass
doors.
11.
Plated surfaces have been wiped clean.
DO NOT TILT THE UNIT ON THE CAST IRON
LEGS. Lift the unit upright and place it into position
on the floor protector.
TABLE OF CONTENTS
CLEARANCES
INSTALLATION
2-10-3 Rule ..........................................................11
Flue systems ........................................................11
7004-187F September 1, 2008
Yosemite Wood Stove
WARNING!
TABLE OF CONTENTS
as a thimble ..........................................................13-14
OPERATION
Air controls ...........................................................19
Building a fire .......................................................20
Opacity .................................................................22
Burn rates ............................................................22
Ash removal .........................................................23
SERVICE PARTS .......................................................28
WARRANTY ...............................................................30
R
(Cont'd)
Page 3