Termination Locations; Vent Termination Minimum Clearances - Heat & Glo 6000GBV-IPI Owner's Manual

Installation and operation
Hide thumbs Also See for 6000GBV-IPI:
Table of Contents

Advertisement

6 6

Termination Locations

A. Vent Termination Minimum Clearances
WARNING
Fire Risk.
Maintain vent clearance to combustibles as
specifi ed.
• DO NOT pack air space with insulation or other
materials.
Failure to keep insulation or other materials away
from vent pipe may cause overheating and fi re.
8 FEET
LOWEST
DISCHARGE
LISTED B-VENT
OPENING
TERMINATION
CAP
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Roof Pitch
Flat to 6/12...........................................................1.0*
Over 6/12 to 7/12 .................................................1.25*
Over 7/12 to 8/12 .................................................1.5*
Over 8/12 to 9/12 .................................................2.0*
Over 9/12 to 10/12 ...............................................2.5
Over 10/12 to 11/12 .............................................3.25
Over 11/12 to 12/12 .............................................4.0
Over 12/12 to 14/12 .............................................5.0
Over 14/12 to 16/12 .............................................6.0
Over 16/12 to 18/12 .............................................7.0
Over 18/12 to 20/12 .............................................7.5
Over 20/12 to 21/12 .............................................8.0
* 3 foot minimum in snow regions
Figure 6.1 Minimum Height From Roof To Lowest Discharge
Opening
22
VERTICAL
WALL
X
12
ROOF PITCH
IS X/ 12
H (Min.) Ft.
Heat & Glo • 6000GBV, 6000GBV-IPI • 2104-900 Rev. H • 11/08
B-VENT GAS, WOOD OR FUEL
OIL TERMINATION
C
A
GAS
TERMINATION
Wood & Fuel Oil
Gas
Termination
Termination
A
6 in.
20 in. min.
B
8 ft.
8 ft. min.
C
18 in.
18 in.
Figure 6.2 Staggered Termination Caps
B-VENT GAS, WOOD OR FUEL
OIL TERMINATION
20 IN. MIN. *
WOOD OR
(508 MM)
GAS TERMINATION
* IF USING DECORATIVE CAP COVER(S), THIS DISTANCE MAY
NEED TO BE INCREASED. REFER TO THE INSTALLATION
INSTRUCTIONS SUPPLIED WITH THE DECORATIVE CAP COVER.
Figure 6.3 Leveled Termination Caps
B
Comments
Horizontal distance between terminations
Distance to perpendicular wall
Vertical distance between terminations
8 FT.
(2.4 M)
(MINIMUM) TO
PERPENDICULAR
WALL
(GAS ONLY)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6000gbv-ipilp6000gbv-lp6000gbv

Table of Contents