4 4

Termination Locations

A. Vent Termination Minimum Clearances
WARNING
Fire Risk.
Explosion Risk.
Maintain vent clearance to combustibles as
specifi ed.
• Do not pack air space with insulation or other
materials.
Failure to keep insulation or other materials
away from vent pipe may cause fi re.
Measure vertical clearances from this surface.
Measure horizontal clearances from this surface.
(See Figure 4.4 for specifi c clearances)
Figure 4.1
Figure 4.2 specifi es minimum vent heights for various
pitched roofs.
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
2 FT.
20 INCHES MIN.
MIN.
LOWEST
DISCHARGE
OPENING
GAS DIRECT VENT
TERMINATION CAP
Roof Pitch
Flat to 6/12...........................................................1.0*
Over 6/12 to 7/12 .................................................1.25*
Over 7/12 to 8/12 .................................................1.5*
Over 8/12 to 9/12 .................................................2.0*
Over 9/12 to 10/12 ...............................................2.5
Over 10/12 to 11/12 .............................................3.25
Over 11/12 to 12/12 .............................................4.0
Over 12/12 to 14/12 .............................................5.0
Over 14/12 to 16/12 .............................................6.0
Over 16/12 to 18/12 .............................................7.0
Over 18/12 to 20/12 .............................................7.5
Over 20/12 to 21/12 .............................................8.0
* 3 foot minimum in snow regions
Figure 4.2 Minimum height from roof to lowest discharge
opening
A
6 in. (minimum) up to 20 in.
152 mm/508 mm
20 in. and over
Gas, Wood or Fuel Oil
Termination Cap
B
A *
Gas
Termination
Cap **
*
If using decorative cap cover(s), this distance may need to be
increased. Refer to the installation instructions supplied with the
decorative cap cover.
In a staggered installation with both gas and wood or fuel oil
**
terminations, the wood or fuel oil termination cap must be
higher than the gas termination cap.
Figure 4.3 Multiple Vertical Termination
HORIZONTAL
OVERHANG
VERTICAL
WALL
X
12
ROOF PITCH
IS X/ 12
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
H (Min.) Ft.
B
18 in. minimum
457 mm
0 in. minimum
9